Technical design of rough levelling, as well as road and water engineering of industrial sites. Prepared for power-intensive industry. Design of access road to county road 505. Geotechnical assessments related to masses and mass movement.

Value for the customer

The site has been levelled at the most favourable time in terms of geotechnical ground conditions and the weather.

As it rains a lot in Western Norway, the period from March to May/June is traditionally the time with the least precipitation, which has been very favourable in this project. The clay becomes like a liquid soup that is impossible to move and compress during heavy rainfall.

Location:
Undheim

Client:
Weatherlands AS

Project planning:
Vial AS / Vial Energy AS

 